Skip to content
English
  • There are no suggestions because the search field is empty.

Raw Data Logging Setup 4.4

Raw data logging setup for post-processing


Raw data logging setup step-by-step

1. Setting Up the Equipment
    • Set up the tripod, mount and level the tribrach onto the tripod.
    • Check that the tribrach is correctly centred over the marker.
    • Place and lock the carrier into the tribrach.
    • Screw the iCON gps 60 SmartAntenna onto the carrier.
    • Check that the tribrach is still correctly positioned and levelled. If available:
    • Hang the external battery onto a tripod leg.
    • Take the GEV219.
    • Attach the connectors with the 8 pin plug to the iCON gps 60 SmartAntenna.
    • Attach the connector with the 5 pin plug to the external battery.
    • Turn on the antenna.
     Else:
    • Use internal battery of the antenna without battery cabling.


2. Configuring the Raw Data Logging
     • Refer to 6.4 Raw Data Logging.