Raw Data Logging Setup 4.4
Raw data logging setup for post-processing

Raw data logging setup step-by-step
1. Setting Up the Equipment
• Set up the tripod, mount and level the tribrach onto the tripod.
• Check that the tribrach is correctly centred over the marker.
• Place and lock the carrier into the tribrach.
• Screw the iCON gps 60 SmartAntenna onto the carrier.
• Check that the tribrach is still correctly positioned and levelled. If available:
• Hang the external battery onto a tripod leg.
• Take the GEV219.
• Attach the connectors with the 8 pin plug to the iCON gps 60 SmartAntenna.
• Attach the connector with the 5 pin plug to the external battery.
• Turn on the antenna.
Else:
• Use internal battery of the antenna without battery cabling.
2. Configuring the Raw Data Logging
• Refer to 6.4 Raw Data Logging.