Workflow 10: Daily machine check-in
An ideal control point, used for machine check-in, is positioned in an area that will not be disturbed for the duration of the project. The location should allow for the machine to be level in cross slope, and the blade should be level. Use of a spotter on the ground is recommended to position the blade precisely.


